A REGULAR MEETING OF THE CORNWALL PLANNING AND ZONING COMMISSION WILL BE HELD ON TUESDAY, SEPTEMBER 9, 2008 COMMENCING AT 7:30PM IN THE CORNWALL TOWN HALL MEETING ROOM


Karen Griswold Nelson, Land Use administrator

August 14, 2008 Revised September 4, 2008


AGENDA

Call to Order by the Chairman

Designation of Alternates. LaPorta, Pryor and Kearns.


PUBLIC HEARINGS:

App # 208 - Harry R. DePolo applicant/owner - Special exception for the location of a new structure and septic outside of any buildable area on a pre-existing lot of record as per Article IV, paragraph 4 – corner of Route 128 and Dibble Hill Road.


PRESENTATION:

"Overview of NW CT Regional Planning Collaborative and What the Collaborative Can Do For You". Jocelyn Ayer and Chris Wood, with Introduction by Tom McGowan".


REGULAR MEETING:

1. APPLICATIONS FOR ZONING PERMITS.


2. APPROVAL OF MINUTES. May 25th, June regular 10th, June 24th special meeting and regular meetings, July regular and special meetings and August regular and special meetings.


3. NEW APPLICATIONS:

4. PENDING APPLICATIONS:

  1. App #702/203 - Erik Elwell applicant/Seal Rock Development LLC owner – (1) 3 Lot subdivision and (2) Special exception for lots for single family residential use in a R-3 zone located on a private street as per Article VIII Section 22 – 189 Great Hill Road.

  2. App # 208 - Harry R. DePolo applicant/owner - Special exception for the location of a new structure and septic outside of any buildable area on a pre-existing lot of record as per Article IV, paragraph 4 – corner of Route 128 and Dibble Hill Road


5. CORRESPONDENCE AND COMMUNICATIONS RECEIVED.

  1. OTHER BUSINESS.

    1. #751- James Leahy owner/Patrick Hackett applicant – driveway to a single family residence – Everest Hill Road. Revisit of zoning permit.

    2. Outdoor wood burning furnace procedures for approval.


  1. ADJOURNMENT

ZONING PERMITS – August 6, 2008 - September 9, 2008


#760- Judy and Allen Herkimer - Installation of a new outdoor wood burning furnace in compliance with zoning requirements for set-backs for accessory structures and current DEP requirements – 42 Bald Mountain Road.


#761- John and Nancy Calhoun - Installation of a solar electricity system (consisting of 48 photovoltaic modules) on an existing agricultural accessory structure – 10 Valley Road.


#762- Mark Jones - Installation of a new outdoor wood burning furnace in compliance with zoning requirements for set-backs for accessory structures and current DEP requirements – 42 Bald Mountain Road.


#763 – April Neubauer/John Bolus applicant – 18’ x 60’ inground swimming pool – 141 Valley Road.


#764 – Doug Schloss - - Installation of a solar electricity system (consisting of 48 photovoltaic modules) – 186 Flat Rocks Road.