Minutes of Regular Meeting on February 19th, 2008



















Present Y- N


Regular Members;




Y

Anne Ingvertsen

Y

Earl Brecher




N

Celia Senzer

N

Sally Hart





Y

Ralph Gold







Y

Tom Bechtle

















Alternates;


Others;





N

John LaPorta

Y

Barbara Cantoni, Board Clerk



Y

Jack Preston

Y

Gordon Rigeway, First Selectman





Y

Richard Bramley, Selectman




















Call to Order:


7:38 p.m.

























Chairman


Asked Jack Preston to sit in for Celia Senzer






























Additions to the


None







Agenda



























Minutes:


Minutes of the January 15th, 2009 meeting were mailed to all members.



All reported reading the minutes.













Chairman


asked for a motion















Motion:


Tom Bechtle - made a motion to approve the minutes as presented



Jack Preston seconded













Chairman


Asked for any discussion















One grammatical error and one typographical error were pointed out. Change the "T"



to the left of Tom Bechtle under "Present Y-N" to a "Y". Add an "s" to the word "line" in the



third sentence of the first paragraph under "Reports of Boards and Commissions"










Motion:


Tom Bechtle made a motion to approve the minutes as amended



Jack Preston seconded






Motion passed unanimously.






















Reports of Boards


Board of Selectmen - First Selectman Gordon M. Ridgway

and Commissions:











"It is snowing... literally" was the segue into an update about the Highway Budget Lines. Gordon



reiterated that the Highway Snow Removal line is currently over budget due to the many snow and ice



events this winter. It is anticipated that the HWY repair line and the HWY fuel lines will be over



budget as well. These overages are connected to the Snow Removal line; the more a piece of



equipment is used the more maintenance it requires and the more fuel it consumes. The BOS



is hopeful that aside from the Snow Removal line, the rest of the HWY budget will offset itself and



stay within budget on an overall basis.














The relamping contracted for the town buildings has been completed and the CCS gymnasium is



reporting the same benefit as the town garage, better illumination. This procedure is expected to save



the Town of Cornwall approximately seven to eight thousand dollars per year. The savings



will offset the cost of the relamping in approximately three years and after that the savings will be



visible as a reduction in expenditure for electricity.




Additionally, CCS has received three years of free light bulbs for the new fixtures.












Through superior participation in the Energy Incentive Program , the Town of Cornwall has qualified



for a larger solar panel that will generate about $1,500 in electricity per annum for CCS.



The BOS anticipate a savings of two thousand dollars per annum from the HWY heat line for



next year as the waste oil furnace gets utilized.













Next week there will be a meeting of area town officials and the Lieutenant Governor at the Wandering



Moose to discuss current economic issues that are affecting the northwest corner of Connecticut.



Formal budget negotiations are not really underway at the state level, the actual deficit is much larger



than the figure used by Governor Rell when she created her preliminary budget.












The BOS and the school board met at a special meeting of the BOS on 1/27/2009



They discussed the recent teacher contract for 2009-2012 which had been negotiated and



received by the town clerk for review. They discussed options, the economy and the state's economic



status in terms of the new contract. The BOS made a motion and passed it unanimously to



submit a request to the BOE to reopen the teacher contract negotiations for the contract period



of 2009-2012 after two years, for the purposes of renegotiating salaries and benefits.



Subsequently the union was not amenable to this request, the recourse available is arbitration.



The BOS are not inclined to enter into arbitration. The effect of arbitration in other towns/regions



show benefit packages above what is currently fixed in this contract.





































Transfers:


None


Number































Discussion of


Revision #12 of the BOS draft expenditure budget was mailed to all members with their packet.

BOS Draft


First Selectman Ridgway presented the budget by department, line by line pointing out reductions

Budget


and explaining any increases. Currently the overall budget increase is 1.29 % There are some



items that are under contract and not negotiable such as the cost of the town audit and the payroll



increases to the union employees. Health insurance costs are a major factor with an anticipated



increase in premiums of 24% projected by Sam Herrick, Business Manager for Region #1.



The BOS are currently exploring alternatives to our current health insurance provider including



offering a high deductible plan that includes a H.S.A. (health savings account)



Additionally, the BOS is increasing the % of premium contribution by each employee to help



mitigate the increase in overall cost.





Cornwall has a secured an extended rate freeze of one year on the Public Liability and Auto



Insurance policies, this a reflection of an excellent record.



All departments were discussed. First Selectman Ridgway fielded questions from the BOF regarding



some specific costs in the following departments; Finance Office, Park and Recreation,



Social Services, Organizational Support and Town Office Administration. It was agreed that



a copy of a report submitted to the BOS by the Social Service Administrator would be provided to



substantiate the request for a new line item and funding for a part-time clerk.



It was noted that the line for Cornwall Youth Safety has been dropped from the BOS budget.



The Cornwall Youth Safety group has disbanded.




A modest 3% increase to all of the non union salaries was presented by the BOS within this budget.



The underpinning for this measure is wage equity among all town employees. Union



employees have a built-in annual salary step in their contract. If the BOS increase



the % that employees contribute to health insurance premiums and do not



increase employee salaries at all, the effect is a financial penalty to all non union employees.




























Discussion of


A Capital Budget proposal for FY 2010 was mailed to all members with their packets.

Adjustments to


Modifications to FY 2010 from the approved Five Year plan resulted in a reduction to the Capital

FY '10 Capital


Budget of $30,000. CCS Playing Field Upgrades for 50,000 was suspended after a discussion with



the CCS Principal. Highway Equipment was added for 10,000 and 10,000 was appropriated



for Town Hall Building Upgrades. The rest of the Capital Budget remained the same as the approved



Five Year plan. Highway Equipment would include a fire alarm system for the town garage



and a new bed for truck #3. Town Hall Upgrades would include replacement of rotting window



frames, replacement of the inseam gutters that are not working properly, refinishing the floors that



have worn down to bare wood and general painting.




Brief discussion ensued and First Selectman answered questions.



















Chairman


Wanted to remind the BOF that the BOE has incurred Unemployment Benefit Expense



and they will be presenting a request for funding that expense as some point



before the end of FY 2009.













Chairman


Issued a general comment to the BOS about their proposed expenditure budget which requested



a closer look at the non union salary increases and the possible elimination of them.














































Adjournment:


8:55 p.m.
















Motion:


Jack Preston made a motion to adjourn



Earl Brecher seconded





Motion passed unanimously.























































Respectfully Submitted:







Barbara Herbst








Board Clerk